News

PVC Pipe Fitting Mold Design Checklist: 7 Pre-Production Steps That Eliminate Costly Rework
2026-05-18
1. Missing draft angle is the number one root cause of mold rework, accounting for 35-40% of all T1 modification costs - verify 1.0-1.5 degrees draft on all external cavity surfaces and 0.5-1.0 degrees on internal cores before cutting any steel.
2. Wall thickness variation exceeding 15% create...
view
detail

Top 8 Pipe Fitting Mold Manufacturers in China for 2026: Lead Time, Steel Grade, and After-Sales Compared
2026-05-18
1. The top 8 Chinese pipe fitting mold manufacturers differ most in steel grade sourcing and after-sales support — H13 steel from Assab (Sweden) vs. domestic H13 from Dongbei Special Steel can mean a 200,000-shot lifespan difference in your mold even when both are labeled "H13."
2. Lead ...
view
detail

Ningbo UME Mould & Plastic Tech Celebrates UME Team's 1st Anniversary: Crafting Global Mould Excellence with Artisanship
2026-01-13
On the occasion of its 15th founding anniversary, Ningbo UME Mould & Plastic Technology Co., Ltd. established the UME Team in June 2024. The team’s mission is to inherit UME ’s core value of "precision and rigor," and deliver more professional, high-quality mould products to new and...
view
detail










